| Location of performance / Site: | Sankt Ingbert, Saarland, Germany, Europe |
|---|---|
| Period: | Apr 2001 - May 2002 |
Construction management for the construction of the surface capping system for the landfill for neutralization sludge residues of the wire production plant "Drahtwerke St. Ingbert"